Knowledge Booster: G_SR_26 Edition (04 Mar 2026)
Welcome to today's G_SR_26 Knowledge Booster! We've handpicked 10 essential questions from our database to help you sharpen your skills. Dive in and test your knowledge!
Q1. After motor operated point operation check __________ and __________ indications.
- A) Normal Reverse
- B) Track Route
- C) Green Red
- D) White Yellow
Correct Answer: Normal Reverse
Explanation: As per S.R.3.38.7.1.
Q2. Minimum equipment at Class B MAS station are __________.
- A) Home Starter Advanced Starter
- B) Distant Home Starter
- C) Home IBS Starter
- D) Starter LSS
Correct Answer: Distant Home Starter
Explanation: As per G.R.3.27(a).
Q3. Whenever two yellow lights are exhibited in Distant signal the Aspect is __________.
- A) Attention
- B) Caution
- C) Proceed
- D) Stop
Correct Answer: Attention
Explanation: Two yellow lights indicate Attention aspect.
Q4. At a ‘A’ class station line clear may not be given for a train unless the line is clear for at least __________ mts beyond the Home signal or up to __________.
- A) 180 mts Starter
- B) 400 mts Advanced Starter
- C) 120 mts Home Signal
- D) 100 mts Outer
Correct Answer: 400 mts Advanced Starter
Explanation: As per G.R.1.03(2) at Class A station line must be clear for 400 metres beyond Home signal or up to Advanced Starter.
Q5. __________ type of shunt signals shall be provided in colour light area.
- A) Position light
- B) Disc type
- C) Mechanical
- D) Banner
Correct Answer: Position light
Explanation: As per SEM 7.42.2.
Q6. Route indicators are treated as __________.
- A) Stop Signals
- B) Shunt Signals
- C) Subsidiary Signals
- D) Automatic Signals
Correct Answer: Stop Signals
Explanation: As per S.R.3.19.1. Per GR 3.09 and SR 3.19, route indicators are integral to stop signals (like Home or Starter) for indicating diverging routes and are governed by the same 'ON'/'OFF' aspects.
Q7. __________ is the authority to pass defective independent shunt signal at ON.
- A) T-369(3b)
- B) T-806
- C) T-409
- D) T-511
Correct Answer: T-369(3b)
Explanation: Authority form for passing defective shunt signal.
Q8. If all lines blocked and line clear granted points set for __________.
- A) Safety Siding
- B) Sand Hump
- C) Loop Line
- D) Main Line
Correct Answer: Safety Siding
Explanation: As per S.R.3.38.6.
Q9. The Aspect of the Calling On signal when taken ‘OFF’ is __________.
- A) Proceed
- B) Caution
- C) Stop
- D) Proceed cautiously up to next stop signal
Correct Answer: Proceed cautiously up to next stop signal
Explanation: Calling ON permits train to draw ahead cautiously up to next stop signal.
Q10. Newly erected or shifted signal shall be jointly inspected by __________.
- A) Operating Signal Engineering
- B) Safety Accounts Personnel
- C) Commercial Mechanical Electrical
- D) Traffic Civil Medical
Correct Answer: Operating Signal Engineering
Explanation: Signal sighting committee.
0
0
Best portal for railway departmental exam
mycbt.in - join free
Comments 0
Post CommentNo comments yet. Be the first to comment!